Instant International Shipping Rate Calculator
Automated IATA volumetric weight conversion (DIM 5000). Look up official UPS Air Net Rates to over 220 countries and generate official PDF quotations in 30 seconds.
From route surveys and special permits to transport and on-site positioning — a single point of contact for all your industrial project logistics.

> 500 Tons
Payload Capacity
Special Permit Issuance
Rapid, 100% Compliant
Indicative oversized & heavy-lift transport rates based on a standard ~200km haul. Specialized equipment costs included.
The rates above are illustrative benchmarks for standard distances. Actual project costs depend heavily on:
* Each project requires an on-site route survey to engineer the most cost-effective plan.
Automated IATA volumetric weight conversion (DIM 5000). Look up official UPS Air Net Rates to over 220 countries and generate official PDF quotations in 30 seconds.
Definitions and mandatory statutory permits pursuant to prevailing road administration regulations.
Non-dismantlable cargo whose overall loaded vehicle dimensions exceed statutory clearance thresholds.
Non-divisible cargo causing combined gross vehicle weight (GVW) to exceed highway statutory limits.
| Permit Category | Applicable Criteria | Issuing Authority | Processing Turnaround |
|---|---|---|---|
| Overweight Vehicle Circulation Permit | Gross Weight exceeds standard thresholds | Department of Transport (Provincial) or Vietnam Road Administration (National Highways) | 2-5 days |
| Oversized Cargo Circulation Permit | Overall Dimensions exceed statutory limits | Department of Transport or Vietnam Road Administration | 2-5 days |
| Heavy Lift & Out-of-Gauge Transport Permit | Non-divisible cargo exceeding both weight & dimensional thresholds | Vietnam Road Administration / DoT per route | 2-5 daysMax validity 30 days / single journey |
| Road Construction & Obstacle Clearance Permit | When requiring road reinforcement or obstacle relocation (power lines, trees...) | Competent Road Management Authority | Case-by-case evaluation |
Each circulation permit is issued exclusively for 1 vehicle and 1 specific itinerary (one-way or round-trip). If a project involves multiple convoys, each trailer requires an independent permit regardless of identical routes. For extreme dimensions (e.g., width > 3.5m or length > 20m), an official escort convoy is mandatory by law.
For project cargo, a single mistake—miscalculated dimensions, route permit discrepancies, or out-of-sequence delivery—can disrupt multi-million dollar schedules. Allship controls the entire logistics chain on a single unified data ecosystem.
Wind turbine blades and tower sections possess extreme length and diameter, traversing multiple provinces with diverse bridge and road limits; turbine erection milestones are strictly tied to Commercial Operation Date (COD) deadlines.
Comprehensive route surveys conducted early during planning, coordinating concurrent permit filings for multi-trailer convoys to prevent installation bottlenecks.
Transport schedules synchronized with EPC general contractor construction timelines, featuring automated alerts if permit approvals risk delay.
All rates below represent typical market benchmark ranges. Project cargo requires bespoke planning — an exact quotation requires Allship engineers to conduct on-site route surveys, cargo inspections, and timeline assessments.
Cargo classification, exact dimensions, weight, and engineering drawings (if available) to verify out-of-gauge/heavy lift thresholds.
Vehicle registration certificates, valid roadworthiness safety inspection, and environmental compliance certificates.
Detailed proposed itinerary, transit timetable, active safety measures (lead escorts, warning strobes), and road structure protective provisions.
Enterprise business license of carrier, accompanied by certified bridge/tunnel capacity assessment reports by accredited surveyors if weak structures exist.
Note: Dossiers should be submitted 3-5 business days prior to scheduled movement. For multi-provincial transits or structurally sensitive bridges, evaluation periods may extend. Allship strongly advises finalizing cargo dimensions and route plans early to safeguard project milestones.
100% Legal Compliance
100%
Partnering with critical mega-projects, we understand the technical specifications and stringent safety demands of specialized industrial sectors.
Transporting out-of-gauge components for renewable energy (wind, solar) and utility-scale thermal power projects.
Engineered technical solutions ensuring absolute safety for pressure vessels, columns, and sensitive custom tanks.
Continuous logistics supply for heavy precast concrete, structural steel girders for seaports and airports.
Turnkey dismantling, relocation, and installation of full factory production lines with strict risk control to ensure on-time commercial operation.
Hauling extreme heavy-duty mining machinery across mountainous, rugged terrain with professional route surveys and road reinforcement.
Successful Out-of-Gauge
Projects Completed
Days Average
Permit Turnaround
Active Tracking &
Incident Response
Specialized Heavy
Haul Vehicles
Extensive battle-tested expertise with deep knowledge of statutory transport regulations and localized permitting nationwide.
Connected TMS directly synced with WMS/OMS — matching transport dispatches seamlessly with contractor installation milestones.
Deploying low-beds, extendables, hydraulic multi-axle modular trailers, and crawler/mobile cranes for any mission.
Close liaison with road authorities and provincial DoTs for expedited, zero-risk circulation permits.
Transparent, standardized operational stages engineered to guarantee safety and pinpoint accuracy for project cargo.
Recording cargo dimensions, gross weights, technical drawings, tentative routes, and milestones.
Physical inspection of entire itinerary, bridge ratings, clearances, and turning radii to evaluate feasibility.
Configuring trailers, optimal routing, transit timetables, and itemized cost transparency.
Compiling and filing official application packages with Road Authorities and Provincial DoTs.
Operating on approved routing, certified escort deployment, and 24/7 GPS telematics.
Final jobsite handover, coordinating crane rigging and precision equipment placement.
Owning and dispatching an extensive heavy fleet, equipped to tackle any engineering specification and payload threshold.

Towing power 300-500+ HP, purpose-built for heavy-lift and out-of-gauge modular combinations.

Ultra-low deck profile for over-height cargo, ensuring clearance under overpasses and through tunnels.

Flexible extending deck length, engineered for extreme-length components such as wind turbine blades.

Extreme capacity (hundreds of tons), combining modular units to distribute load across ground structures.

Facilitating heavy lifts and site placement with lifting capacities up to hundreds of tons.

Certified road-leading units equipped with lighting strobes and signage compliant with road law.
Explore common questions to understand Allship's project cargo transport capabilities and special permit procedures.
Automated IATA volumetric weight conversion (DIM 5000). Look up official UPS Air Net Rates to over 220 countries and generate official PDF quotations in 30 seconds.